Sunday, September 21, 2014

Summer Sunrise


Pine Canyon Lake Sunrise

We mostly finished landscaping the First Baptist Church in Coldwater, the irrigator needs to install the underground watering system then we will go back and wrap things up.  We ran a lot of river wash stone and laid 6 rolls of weed barrier.
The ground is literally moving on our job in Pine Canyon Lake.  A one story hill has been shifted from the road side of the house to the lakeside filling in and flattening the yard.  Many of the mature pine trees have been removed and the house is now in clear view.
Starting the Bluestone Patio
The patio is moving alone nicely and we will be starting the landscaping beds next.  Extensive landscaping with large beds will pull this house back into the woods.
Bill and Gary, A Great Team
Happy and Handsome My Favorite Kind of Equipment Operator

We got back to our job on Clear Lake since the flatwork has been mostly completed.  It is another challenging site impossible when wet, to slippery with very narrow access.  The TR53 cracked and threw a track so we had to use the Bobcat to pull it up.  Two of the hardscape areas are about finished but we will wait until everyone is done at the lakeside before building a rock wall that will further restrict lakeside entry.
Stream Bed Under Deck

Glacial Stone Wall Necessary Before Driveway